BRIDGE BUILDING

SIA 8 CBR has access to all the necessary equipment and technical means for building new bridges and rebuilding existing ones, as well as for the construction of water-based objects. Works are carried out by qualified personnel and certified works managers.

Cranes, pile drivers, support beams, anchors, prefabricated temporary bridges to guarantee traffic flow; structure cleaning, painting and torqueing equipment, as well as vast experience in assembly and concrete pouring works, qualified personnel and certified works managers mean that we are ideally qualified to implement engineering-structure projects of various sizes and levels of complexity.

 

 

 

BIGGEST AND MOST IMPORTANT SITES:

  • construction of the bridge over the Pededze on the P36 highway from Rēzekne to Gulbene;
  • reconstruction of the bridge over Sarkanīte and the bridge over the Pededze on the P40 highway from Alūksne to Zaiceva;
  • reconstruction of the bridge over the River Abuls in Smiltene on the P24 highway from Smiltene to Valka;
  • reconstruction of the road overpass over Bērzaines Street, Cēsis.